You have come the page before
we've had much time to load too many things on it yet. Let's
assume, just for now, that you've already read something (possibly
this) about the project to produce a new Community Plan
for Stoke Climsland. Let's also assume that you came here looking
for information about the existing Parish Plan. If so, read
on as there's some material here already that should useful.
Here's what we've got:
 |
The
process of producing the 2003 Plan started by the compilation
and distribution of the survey on the left. |
 |
612
surveys were distributed and 274 (45%) returned. The responses
were analysed and collated in the Survey Report. |
 |
The
next step was the writing of the formal Parish Plan and
a copy of this is linked on the left. |
 |
Contained
within the report was an Action Plan, detailing what steps
could be taken to realise the aspirations of the Parish
Plan. |
Reading
through this material will give you a good idea of what a Community
Plan could contain. If you are interested in getting involved,
come along to the 'kick-off' meeting being held in the Parish
Hall on March 6th at 7.30pm.
For
more information, why not give Louise Power or Deri Parsons
a call on 01579 370819 or 01579 370319 respectively?